BATHROOM REMODEL 3
This bathroom renovation included relocating the toilet to add a corner shower unit. This modification added value to the house by turning it from a 1-1/2 bath into a 2 full bath.
BEFORE – Dated Design in Desperate Need of a Remodel
DURING – New Walls, New Shower Unit, and Relocated Plumbing
AFTER – Finished Walls, New Shower, Relocated Toilet, New Fixtures